The weekly newsletter on concrete technology for dams and infrastructure. Every Tuesday, a field-tested insight, a verified industry stat, and curated links worth your time. Written by engineers, for engineers.
Check your inbox. We've sent a confirmation email to verify your subscription.
Something went wrong. Please try again or email support@pcciglobal.com.
Free. No spam. Unsubscribe anytime.
The only weekly newsletter dedicated to concrete technology for dam and infrastructure engineers.
Polavaram's 1.5-metre plastic concrete diaphragm wall, the first of its kind in India, was damaged across two monsoons because the upper cofferdam was not built up in time. The pre-monsoon staging lesson before May becomes June.
IS 7861 sets a 40 degree C threshold. ACI 305.1 sets a 35 degree C ceiling. Hoover Dam would have taken 125 years to cool naturally. The Watch / Intervene / Stop framework for summer placement on dam sites.
Willow Creek Dam leaked so badly that a full year of grouting was needed after first filling. The lesson it taught the RCC industry is still misunderstood on Indian sites today.
AAR worked silently inside Rihand Dam for 25 years before snapping 9 of 10 rebars in a single column. How the most dangerous deterioration mechanism hides in plain sight.
How a monsoon flood forced India's first RCC dam switch at Ghatghar, costing Rs 500 million and 13 months. Plus: 80% of India's dams are over 25 years old.
Concrete Pulse is our weekly newsletter on concrete technology for dam and infrastructure engineers. New issues every Tuesday at 10:00 AM IST. Subscribe to receive each issue directly in your inbox, or browse the archive above.